Notice: Function amp_has_paired_endpoint was called incorrectly. Function cannot be called before services are registered. The service ID "paired_routing" is not recognized and cannot be retrieved. Please see Debugging in WordPress for more information. (This message was added in version 2.1.1.) in /home/u267188590/domains/drcpost.com/public_html/wp-includes/functions.php on line 6031

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. The function was called too early (before the plugins_loaded action) to determine the plugin source. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/u267188590/domains/drcpost.com/public_html/wp-includes/functions.php on line 6031

Notice: Function amp_has_paired_endpoint was called incorrectly. Function cannot be called before services are registered. The service ID "paired_routing" is not recognized and cannot be retrieved. Please see Debugging in WordPress for more information. (This message was added in version 2.1.1.) in /home/u267188590/domains/drcpost.com/public_html/wp-includes/functions.php on line 6031

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is not currently doing any hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. The function was called too early (before the plugins_loaded action) to determine the plugin source. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/u267188590/domains/drcpost.com/public_html/wp-includes/functions.php on line 6031

Notice: Function amp_is_available was called incorrectly. `amp_is_available()` (or `amp_is_request()`, formerly `is_amp_endpoint()`) was called too early and so it will not work properly. WordPress is currently doing the `plugins_loaded` hook. Calling this function before the `wp` action means it will not have access to `WP_Query` and the queried object to determine if it is an AMP response, thus neither the `amp_skip_post()` filter nor the AMP enabled toggle will be considered. It appears the plugin with slug `google-analytics-for-wordpress` is responsible; please contact the author. Please see Debugging in WordPress for more information. (This message was added in version 2.0.0.) in /home/u267188590/domains/drcpost.com/public_html/wp-includes/functions.php on line 6031
RDC : Kamerhe et Kinduelo reçus par Tshisekedi - drcpost.com
drcpost.com

RDC : Kamerhe et Kinduelo reçus par Tshisekedi

Depuis la cité de l’Union Africaine à Kinshasa, le Président de la République, Félix Antoine TSHISEKEDI Tshilombo, a reçu tour à tour en audience, lundi 03 juin, Vital KAMERHE et Pascal KINDUELO, respectivement Présidents de l’Assemblée nationale et celui du bureau d’âge du Sénat.

Au sortir de la rencontre, Vital KAMERHE a indiqué que sa visite rentre dans le cadre de la collaboration entre institutions de la République.

Dans la foulée, la chambre basse du Parlement congolais est prête pour l’investiture du gouvernement SUMINWA Tuluka et que la province du Maniema sera sans aucun doute récupérée dans la composition de l’Exécutif, a-t-il affirmé.

De son côté, le Président du bureau provisoire du Sénat, Pascal KINDUELO, a précisé être venu faire rapport au Chef de l’État de la marche de la chambre haute du Parlement congolais.

Pendant ce temps, l’élection des membres du bureau définitif pourrait intervenir dans une semaine, soit le samedi 15 juin en cours, sauf changement de dernière minute, a-t-il renchéri.

Que dire de plus ? Les deux affaires restent à suivre. Let’s wait and see.

Welcome NGIMBI

Quitter la version mobile